Large addition to an existing house in Bridle Trails to create an ADU, garages, home office. Included a Phase 1 grading permit to create a riding arena and pastures for the family horses.
Large addition to an existing house in Bridle Trails to create an ADU, garages, home office. Included a Phase 1 grading permit to create a riding arena and pastures for the family horses.
Finished Addition of ADU over new Garage.
Original garage had been converted to a Living Room. Here there is enough grade change to allow the second floor ADU to walk right onto the upper lawn area.
Excavation starts.
We'll also add a proper covered entry roof to mark the entry to the existing house.
Large footings required for the eventual TALL retaining walls.
Where the new addition meets the existing house.
Concrete footings in place. Now setting the rebar in the retaining walls.
Tall walls here!
Walls getting ready for concrete.
Walls poured, concrete columns will support future point loads.
The red is a liquid applied water proofing.
Loads of lumber starts to arrive.
Framing for the second floor ADU.
The lower addition is an office.
Second floor ready for roof trusses to arrive.
Roof trusses and membrane installed.
Upper ADU can walk out onto upper grade.
New covered entry taking shape.
Finished project.
ADU entrance with it's own wrap around porch.
Lower addition for home office.